• About
  • Join the Co-op / Donate
  • Contact
Saturday, July 11, 2026
Subscribe
No Result
View All Result
The Brief
NB POD
NB MEDIA CO-OP
Events
Share a story
  • Articles en français
  • New Brunswick
  • Canada
  • World
  • Environment
  • Indigenous
  • Labour
  • Gender
  • Politics
  • Culture
  • Videos
  • NB debrief
  • Articles en français
  • New Brunswick
  • Canada
  • World
  • Environment
  • Indigenous
  • Labour
  • Gender
  • Politics
  • Culture
  • Videos
  • NB debrief
No Result
View All Result
NB MEDIA CO-OP
No Result
View All Result
Home Energy

Tantramar diesel plant is a deal New Brunswick can’t afford

Commentary: When convenience drives a multibillion-dollar decision, ratepayers pay the price

by Beverly Gingras
February 26, 2026
Reading Time: 4min read
Sign on a tree in Tantramar reads: "Stop the Tantramar Gas Plant. Clean air, clean water, clean energy for all."

Protest sign in Tantramar calling for the cancellation of the gas plant. Photo: Jigmet Angmo

New Brunswickers have been told that they’re facing a simple choice: a new gas and diesel plant in Tantramar or blackouts.

It’s a powerful story that’s meant to shut down debate. It plays on fear, and it’s meant to make this massive, long-term fossil fuel project feel inevitable.

But after watching the recent Energy and Utilities Board (EUB) hearings on the plant, it’s clear we are being presented with only one solution—the fastest and most familiar one for NB Power.

This project is not unavoidable, like the utility claims. It’s a choice, and that choice will shape power bills, public health and our climate future for decades.

A public utility should not be hiding the public price tag

NB Power is a public utility that belongs to all New Brunswickers. So, as a ratepayer, you deserve to know what you’re being asked to pay for.

Yet at the hearings, NB Power would not share even a rough estimate of what the Tantramar project could cost over the next 25 years.

Utility executives acknowledged it would cost more than $1 billion just to build the plant, but that figure does not include decades of volatile fuel prices, operating costs, maintenance or financing.

This lack of transparency is a big problem.

The public can’t decide whether this project is in their best interest if they don’t actually know the full costs. This isn’t a private business deal. This decision will affect household bills across the province.

Power hikes coming

We do know this plant will cost New Brunswickers. Documents filed with the EUB show NB Power estimated the project could raise rates by nearly five per cent in the first full year of operation.

This comes at a time when New Brunswick already has some of the highest rates of energy poverty in Canada. NB Power has already raised residential electricity rates by nearly 30 per cent over the past three years and is proposing an additional 4.75 per cent increase effective April 1.

Now, NB Power is rushing this plant, and it will lead to even higher electricity rates, putting more pressure on families struggling to keep up with rent, groceries and heating costs. Seniors are stretched, and renters often have little control over insulation and efficiency, but they still have to pay power bills.

Reliability matters, but affordability matters too. NB Power argues this plant is needed to avoid blackouts, yet rising electricity costs can also leave people without power. When households can’t afford their bills, the lights go out just the same.

The easiest solution for NB Power, not New Brunswick

At the EUB hearings, NB Power executives suggested they chose this project, not because it was the best solution, but because it was easier than trying several smaller measures at once.

That is a serious admission, because we know there are better alternatives, they just may not be easier for executives at the public utility.

Right now, modern electricity grids are being built with a mix of solutions. Battery storage, demand response, renewables and grid flexibility are already being used. These are not futuristic ideas.

New Brunswick has an opportunity to learn from this and modernize. Instead, NB Power is pushing a technology of the past.

This is the core problem. NB Power appears to have a culture rooted in tradition rather than transformation. Too often, those traditions lead to decisions that are easiest for NB Power, not what is best for New Brunswickers.

New Brunswick can have reliability without locking into fossil fuels

No one is saying reliability does not matter. It does.

The question is whether New Brunswick is being offered the smartest path forward, or simply the fastest one.

New Brunswickers deserve transparency on the full costs. We deserve a real alternatives analysis. We deserve an energy plan that aligns with climate reality, not one that adds to the problem.

The EUB now has an important decision to make.

If the board decides this project is not prudent, the deal is cancelled. That would mean regulators carefully assessed the risks and costs and concluded that this is not the right investment for this province. This would allow New Brunswick to pursue better alternatives, such as battery energy storage, wind, solar and demand-side management.

If the EUB decides the project is prudent, the plant moves ahead. That means New Brunswickers are tied to a 25-year commitment to fossil fuels, with costs that will show up on monthly power bills and lasting environmental consequences.

Whatever the outcome, the hearings made one thing loud and clear: New Brunswick does not have to settle for old solutions that come with long-term costs. We can build a cleaner, more affordable, more resilient energy system that sets New Brunswick on a path toward long-term energy security and a sustainable future.

That starts with telling the truth about this project, and demanding better from the utility that belongs to all of us.

Beverly Gingras is the executive director of the Conservation Council of New Brunswick.

Tags: Beverly Gingrasenergy povertyEUB hearingsfossil fuelsNB PowerNew Brunswickrenewable energyTantramarTantramar Gas Plant
Send

Related Posts

Gas plant opponents line Sackville bridge saying fight isn’t over
Energy

Gas plant opponents line Sackville bridge saying fight isn’t over

July 10, 2026

About 120 demonstrators waved to passing traffic on the TransCanada highway and on Sackville’s Main Street Thursday in the latest...

‘People’s MOU’ called on feds to change course on climate policy ahead of pipeline announcement
Energy

‘People’s MOU’ called on feds to change course on climate policy ahead of pipeline announcement

July 3, 2026

Climate scientists reported record-breaking ocean surface temperatures in June amid a deadly heatwave in Europe, while Canadians experienced record heat...

Two men sit on stage holding microphones during a panel discussion, in front of a backdrop reading 'Pioneering New Nuclear in Atlantic Canada' with sponsor logos including Westinghouse, NB Power, NWMO, and Candu. An audience is seated in the foreground.
Energy

Inside the Small Modular Reactor forum: A narrow energy conversation in New Brunswick

July 1, 2026

In early June, a Small Modular Reactor (SMR) Forum in Saint John brought together industry representatives, government officials, and stakeholders...

Environment

Holt government refuses data centre moratorium as activists rally against Lorneville project

June 19, 2026

About 150 protesters gathered at the New Brunswick legislature on June 11, 2026 to protest against a proposed 390-megawatt AI...

Load More

Recommended

Alternative court program in Elsipogtog should be extended across New Brunswick: legal aid lawyer [video]

Alternative court program in Elsipogtog should be extended across New Brunswick: legal aid lawyer [video]

1 day ago
Study to look at how glyphosate, DDT impact province’s moose

Study to look at how glyphosate, DDT impact province’s moose

2 days ago
Student accepted into UNB grad program stranded in Gaza awaiting Canadian study permit [video]

Student accepted into UNB grad program remains trapped in Gaza one year after applying for Canadian student visa

4 days ago
Gas plant opponents line Sackville bridge saying fight isn’t over

Gas plant opponents line Sackville bridge saying fight isn’t over

20 hours ago
NB Media Co-op

© 2019 NB Media Co-op. All rights reserved.

Navigate Site

  • About
  • Join the Co-op / Donate
  • Contact
  • Share a Story
  • Calendar
  • Archives

Follow Us

No Result
View All Result
  • About
  • Join the Co-op / Donate
  • Contact
  • Events
  • Share a Story
  • NB POD
  • COVID-19
  • Videos
  • New Brunswick
  • Canada
  • World
  • Arts & Culture
  • Environment
  • Indigenous
  • Labour
  • Politics
  • Rural

© 2019 NB Media Co-op. All rights reserved.

X
Did you like this article? Support the NB Media Co-op! Vous avez aimé cet article ? Soutenez la Coop Média NB !
Join/Donate